WHAT WAS DONE
- Civil engineering
- Line trenches
- Soil excavation
- Earthworks
- Separation
- Reinstallation
- Soil stabilisation
- Earthworks
- Construction of excavation pits
- Drainage
- Laying utility media
- Asphalt roadways
- Paved areas
- Green areas
- Fire service bypass
- Compaction control
- Water management
- Concrete roadways
DURATION
- Start: January 2022
- End: March 2023
PLOT SIZE
- 83.250 m2