Kleinostheim

Kleinostheim, civil engineering works industrial plant

WHAT WAS DONE

Demolition and pollutant clean-up

  • Authority management
  • Implementation concept
  • Conventional demolition
  • Complete demolition
  • Industrial buildings
  • Foundations
  • Structural and technical installations
  • Industrial dismantling


Civil engineering

  • Civil engineering
  • Pipeline trenches
  • Installation of pumping stations/separator systems
  • Deconstruction of traffic areas and civil engineering structures
  • Soil excavation
  • Earthworks
  • Reinstatement
  • Soil stabilisation
  • Surface improvement/stabilisation
  • Ground compaction and creation of load-bearing surfaces for subsequent use
  • Earthworks
  • Drainage
  • Laying supply media
  • Soil stabilisation consolidation
  • Asphalt roadways
  • Concrete roadways
  • Fence and gate installations
  • Green areas
  • Industrial road construction
  • Compaction control
  • Site clearance

DURATION

  • Start: April 2020
  • End: December 2021

PLOT SIZE

  • 100,000 m2

MACHINE USE

  • Demolition excavator
  • Crushing plant
  • Crawler
  • Roller
  • Tiller
  • Track excavator
  • Wheel excavator
  • Wheel loader