Kiel, demolition of university hospital

WHAT WAS DONE

Demolition and pollutant clean-up

  • Authority management
  • Implementation concept
  • Remediation concept
  • Environmental/occupational safety concept
  • Selective demolition
  • Complete demolition
  • Demolition of existing buildings
  • Urban buildings
  • High-rise buildings (over 22 m)
  • Foundations
  • Demolition in the city centre

DURATION

  • Start: September 2020
  • End: March 2021

 

MACHINE USE

  • CAT Kettenbagger 330
  • Liebherr Longfront R960

CONVERTED SPACE

  • 45.000 m3

Our demolition team dismantled a former dermatological clinic including ward block and lecture theatre on the grounds of Kiel University Hospital with kid gloves, so to speak. Due to the close proximity to a cardiology department and drug filling centre, it was important to work as vibration-free as possible. We succeeded: the measuring devices did not malfunction once. We implemented a special traffic concept for the hard-to-reach buildings on the edge of the hospital site. Safety was also a priority during the demolition of the 28 metre high, asbestos-contaminated building. This meant working in the black zone on all six floors.

Machines used

CAT 330

Liebherr R960LF