Hamburg

Hamburg, bridge dismantling

WHAT WAS DONE

Demolition and pollutant clean-up

  • Implementation concept
  • Remediation concept
  • Environmental/work safety concept
  • Structural analysis
  • Conventional demolition
  • Selective demolition
  • Complete demolition
  • Partial demolition
  • Demolition of existing buildings
  • Municipal buildings
  • Bridges/engineering structures
  • Demolition of traffic areas and civil engineering structures
  • Bridge demolition

DURATION

  • Start: January 2021
  • End: September 2024

PLOT SIZE

  • 12.000 m²

On the A7 motorway just before the Elbe tunnel, our demolition team demolished an approx. 420 metre long bridge while traffic continued to flow. Our client, ARGE Ersatzneubau K30 (HOCHTIEF Infrastructure GmbH / Fr. Holst GmbH & Co. KG), initially organised the construction of an auxiliary embankment so that traffic could continue to flow. Our experts drew up a concept for the demolition that also included the handling of hazardous materials, the installation, handling and storage of materials and the traffic route situation. Thanks to our experienced machine operators, who worked skilfully and carefully in the cramped working area with high traffic density, the complex demolition was completed quickly.

Machines used

CAT 336